The completed project.

POOL WATER AWAITS!

6/16/2017

0 Comments

 
Picture
It’s been all about framing the main house. An unexpected rain shower last week (completely unheard of at this time of year in Sonoma), meant that we had to quickly tarp over the exposed roof of the existing house. We managed to get the second story master suite framed out and the view is stupendous (see photo).

Meanwhile we’ve been able to finish up the pool with the last coat of plaster and then filled with water and wait the 10 days for the plaster to cure with water inside. Learning: don't pour concrete on a warm windy day. We did just that it dried too fast around the pool and we have some unexpected cracks (few are ok... but we had 2 that required we replace a section at either end of the pool). Plans are to break up the grey a bit on the large step coming out of the pool house by tiling it with a Moroccan looking porcelain tile-- so watch this site for a photo when that is done.

So the pool stats: 58 feet long and 8 ft. wide. 2 sets of steps at either side of the pool. A 6 x 8’ spa sits at one end. The tile used in the pool was Rushmore (Crystal Quartz) and the coping was Davis Pewter. The concrete poured around the pool was half formula of Pewter. Pool cover is grey as well. The plaster color in the pool was half French Grey and it has created a marvelous color of water that reminds of Nice, France. Water came from Santa Rosa area and it took 15,000 gallons to fill the 5.5' deep pool. Notice the lovely plaster job that made me almost not want to fill it up with water.

We are all ready for a dip as the temperatures start to climb!
 

Picture
0 Comments

what a view!

6/10/2017

1 Comment

 
It’s all about framing the main house. An unexpected rain shower this week (completely unheard of at this time of year in Sonoma), meant that we had to quickly tarp over the exposed roof of the existing house. We managed to get the second story master suite framed out and the view is stupendous (see photo). Next up—finish up the pool with the last coat of plaster and then we fill with water and enjoy it while construction moves at a fast pace, we hope.

Picture
Picture
The view from what will be our master suite french doors.
1 Comment

Demo, framing & concrete, oh my.

6/5/2017

0 Comments

 
We’ve now got concrete poured for the new parts of the main house and are taking down the old walls on sections of the house that will be replaced and married to the new sections. This is the point where you can really get a sense of all that you’ve been planning on paper.

First up, spec out all the windows. I have been agonizing over the window type in which location and the grille pattern. As I sat down with Dino, we walked through the house floor plan and also looked at the elevations to make sure we had consistency and the right window given its location and use. For example, windows that are high up and not used for anything other than to bring in light (and there are many) are mostly fixed windows and we will probably use Milgard (as we did in the pool house) for those.

For more obvious windows, it’s probably Jeldwen (clad out, wood in) and will be a variety of awning, casement and in some cases double hung. With 43 windows, this is one of the largest cost factors and getting it right and within budget is a challenge. As much as I’d like to splurge on the windows, it’s probably not going to happen. And we have indoor cats so figuring out screen solutions is a priority.
We had to dismiss using Marvin because their dimensions are just slightly different than normal and we have already done most of the framing. Pella is too expensive for as many windows as we have   Many have used Sierra Pacific, but they didn’t make our short list.  (Houzz and Garden Web are great places for reviews and feedback on window manufacturers). Ultimate, it's a careful balance of budget, desired look, usability, and reputation.
 
 We decided to create height on the front of the main house with a very tall library, which is a story and half. The 2nd story is being added to the back for the master suite so that it has views over the vineyard and to the hills-- it would have been odd not to have a bit of height in the front. And like the pool house, the library ceiling is souring and quite spectacular.

With the sun out, it means that we were able to pour the concrete around the the pool and pool house—adjacent to the garden  We decided on “half-pewter” which is half formula of the color we used for the coping. In the interest of cutting some costs, we did a soft brush texture with the pour and included no other elements. We are deciding on whether additional design needs to be “cut in” after the pour. And we've also got some cracks that we didn't count on. It was a large pour and we did it on a rainy day so the concrete dried faster than would have been desirable.

Picture
Picture
Picture
Picture
Front of the house... the library "spires" and the job site dog.
0 Comments

    Canappela Farm

    Celia Canfield and David Appelbaum. A farmhouse and garden homestead in Sonoma, CA.

    Archives

    January 2018
    November 2017
    August 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    November 2016
    October 2016

    Categories

    All

    RSS Feed

Picture
For information on weekend rentals, location shoots, locavore dinners, music schedules, or cooking camps, please email - info@canappelafarm.com  
© COPYRIGHT 2015. ALL RIGHTS RESERVED.
  • About
  • Construction Phase
  • Contact
  • Off the Farm
  • Down on the Farm
  • Cooking Camp